Please be aware that we have received notification of a date change to a temporary road closure at Downend Crescent, Puriton for approximately 140 metres.

The new date for the works to commence is 22nd August 2022  and is expected to last until  2nd September 2022 between the hours of 00:00 – 23:59.

These works are for RA Dalton to carry out pipe works to an existing manhole, their works reference is ttro843097SE.

The contractor has indicated that access for Emergency Services through the site  is permitted on this occasion.

The link to view the new Notice is as follows: https://api-gb.one.network/downloads/tm/1111/06-notice-3-road-closures_130368354_3471570_1bff32337d.pdf

For any further information about this closure please contact   R A Dalton on 01388 418 233, quoting the above works reference number.

A map of the affected area (in red), together with the recommended diversion route (in purple) is shown below, along with the link to One.Network.